OUR PROJECTS

Beresford Rd Public School

Supply & installation of 4 x 8.4 kW Daikin high wall splits into School Hall.

The outdoor unit compressors were mounted on brackets & enclosed in black powder coated cages for protection. We located the outdoor units away from the indoor unit heads to ensure the special needs enclosure area was free of trip and fall hazards. We installed site specific manufactured Colorbond trunking to enclose pipework & navigate through the fence and around the corner.

Our project at the Australian Museum – Long Gallery with our Construction partner AJ Bristow.

We provided: 

  • Design, supply, and installation of new Air Conditioning and Ventilation Systems
  • New rooftop air handling units – including a night time crane lift

OUR CLIENTS